is this a problem??
Posted: Mon Apr 12, 2004 12:39 pm
hi all -
I think I have been working too many hours getting this project done - stopped long enough to reread some posts here tonight and realized I may have a problem.
My walls are true double walls - 2X4 wood studs seperated by between 8 and 16 inches - filled with R19 fiberglass insulation. - Here's my concern - I have used RC on both of the walls (leafs) - if this is a problem can I just "short out" one of the walls (say the control room side) by screwing through the RC into the wood studs? - or do I have to remove the drywall and then remove the RC? - I am putting 5/8 then 1/2 then 5/8 drywall on each wall and ceiling. All seams are well caulked as well.
Thanks
Dan
I think I have been working too many hours getting this project done - stopped long enough to reread some posts here tonight and realized I may have a problem.
My walls are true double walls - 2X4 wood studs seperated by between 8 and 16 inches - filled with R19 fiberglass insulation. - Here's my concern - I have used RC on both of the walls (leafs) - if this is a problem can I just "short out" one of the walls (say the control room side) by screwing through the RC into the wood studs? - or do I have to remove the drywall and then remove the RC? - I am putting 5/8 then 1/2 then 5/8 drywall on each wall and ceiling. All seams are well caulked as well.
Thanks
Dan