How thick should my walls be, should I float my floors (and if so, how), why is two leaf mass-air-mass design important, etc.
Moderators: Aaronw, sharward
-
aschatzb
- Posts: 95
- Joined: Wed Dec 01, 2004 2:23 am
- Location: Asheville, NC
Post
by aschatzb »
hello,
The guys installing the drywall used a full schedule of screws on the first layer, even though I told them otherwise.
Do we pull the screws and mud the holes? Or are we better off leaving the screws?
I need to tell them something by tomorrow morning... Any quick advice would be very welcome:)
thanks,
andrew
-
rod gervais
- Senior Member
- Posts: 1464
- Joined: Wed Oct 08, 2003 1:48 am
- Location: Central Village CT
-
Contact:
Post
by rod gervais »
Leave the screws
Rod
Ignore the man behind the curtain........
-
knightfly
- Senior Member
- Posts: 6976
- Joined: Sun Mar 16, 2003 11:11 am
- Location: West Coast, USA
Post
by knightfly »
Right; in fact, some local codes won't even LET you use half-schedule on ANY layer (Californicate

)
Soooo, when a Musician dies, do they hear the white noise at the end of the tunnel??!? Hmmmm...
-
aschatzb
- Posts: 95
- Joined: Wed Dec 01, 2004 2:23 am
- Location: Asheville, NC
Post
by aschatzb »
Thanks guys! that's a bit of a relief...
can't wait for this to be over with... talk about epic!