For all you veterans...
How much did you plan on spending? How much did you actually spend?
What was your final price per sq. ft?
That and any other hindsight greatly appreciated!
How much $$$ did you plan vs. actually spent?
Moderators: Aaronw, kendale, John Sayers
-
chrisgraff
- Posts: 42
- Joined: Sat Dec 17, 2005 6:25 am
- Location: Nashville, TN
-
Aaronw
- Moderator
- Posts: 1771
- Joined: Thu Sep 18, 2003 3:06 am
- Location: Music City
- Contact:
-
chrisgraff
- Posts: 42
- Joined: Sat Dec 17, 2005 6:25 am
- Location: Nashville, TN
-
JohnGardner
- Posts: 290
- Joined: Tue Jul 13, 2004 11:07 am
- Location: Christchurch, New Zealand
- Contact:
-
digipenguin
- Posts: 8
- Joined: Mon May 19, 2003 8:28 pm
- Location: St. Louis, MO. USA
I have a two story converted garage studio. The first floor is the live room and vocal booth. It is fully soundproofed and lightly treated. It has a 9' ceiling. The second floor is the control room/lounge and is lightly soundproofed and heavily treated. It has an 8' 4" ceiling. The outer perimeter of the building is 26' X 18'. I planned on spending 4K in construction costs and got away with about 5K. That includes treatments. My walls have a noise reduction of about 60dB and my control room has a very nice frequency response. I was able to keep the costs low by performing almost all of the work myself.
John D. Geisen
Owner DPS
Owner DPS