I tracked down a price tag on those cam hinges ...
'They' weren't kidding when they said $uper Door! Looks to be about $130/ hinge.
The magnetic sealer tracks are $20/ft. I'll need about 17 ft for 2 side runs & the top.
With the door being about 6' 8" x 36" x 1 3/4" solid oak [as the base], I was wondering if 3 hinges would be correct
----
As for the progress side ... well, I guess slowly is better than nothing. I keep thinking about Andres' sig regarding designing/build ratio. It's tough when people are calling on projects and I have to say 'no can do for now'.
And yet, I still have a couple of to yet resolve ... and they are kinda important.
Heating/AC & fresh air. and the other thing ... getting electricity into this room.
I've been going though the book and forum trying to gather ideas & solutions from other projects. One thing I haven't been able to figure is HOW to get the actual wires into this CR room
To be clear ... my room will be computer based [DAW]. There is no recording to do, so hardware would be minimal. There WILL be, however, the need for several servers. My thought was to get them 'outside' the CR, and run data lines into the CR [CAT].
I'm trying to have everything laid out in SketchUP, but I not really sure how to best get the physical wire in/out of the room. Questions like:.
1. do I penetrate BOTH walls straight in, or maybe through PVC tubing or something ?
Once the wire is inside, the 'plan' was to use the type of 'exterior' runs like you'd see in a temp office. [maybe called channel strips]. Similar idea for the lighting.
Having CAT data lines [I'd like keep all the computer fans/heat/noise out of the room [if possible], and yet have the ability to add additional lines later, as needed.
Oh ... have a structure question too ... Glenn, in the back of the room you designed in symmetrical 'kick-ins' on the back wall. Do I need to do anything on the side opposite the sump pump? Treatment ??? Can it be used for anything ... or is it just 'wasted'.
thanks for all the help !!!!